Revesby: upstairs shower leaking through the ceiling
A failed DIY regrout, fixed with epoxy grout in about 2 hours without removing the tiles. Tested a week later with no leaks.
Every photo here is from one of our own jobs. Most were repaired without removing the tiles. Two shower jobs also needed damaged tiles replaced, and their captions say so.
The full story of a job: the problem, what we found, what we did and how it turned out.
A failed DIY regrout, fixed with epoxy grout in about 2 hours without removing the tiles. Tested a week later with no leaks.
Regrouted and sealed in about 4 hours without removing the tiles, tested a week later with no leaks and signed off by the property manager.
All three balconies regrouted, resiliconed and sealed in 5 days, flood tested two weeks later and signed off by the strata manager.
Walls and floor regrouted and all silicone replaced in about 2 hours, signed off by strata and the owner.
Regrouted, resiliconed and sealed in about 3 hours, flood tested a week later and signed off by strata.
Shower leaking into the garage. Walls and floor regrouted, all silicone replaced and sealed in about 2 hours, with the leak confirmed fixed three days later.
All the old silicone cut out and replaced, regrouted and sealed in about 2 hours, with the leak confirmed fixed three days later.
Shower leaking into a bedroom. Floor regrouted, resiliconed and sealed in about 2 hours, with the leak confirmed fixed three days later.






































Photos show the finished surface before and after the work. Every job is different, and a photo can't show the cause of a hidden leak.
Book a free inspection. Call or SMS 0412 000 893.